Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Event or temporary issue |
Tags: | None |
Date time: | 11.49am, Tuesday 18th November, 2008 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | kbrumann |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Klaas Brumann |
Area: | Cambridge |
Road markings have been painted over. Waiting for dryer weather to apply new, final road markings for the new dropped kerb past the signpost. (See #15315, #15339 and #15333)
Comments reflect the views of the original submitter only.