Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | None |
Date time: | 7.46am, Sunday 17th May, 2009 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Tim Burford |
Willingham - as the limit rises to 40mph, the footway becomes a shared-use cycle path.
Comments reflect the views of the original submitter only.