Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | separation, width |
Date time: | 2.32pm, Wednesday 2nd September, 2009 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | rohanw |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Godmanchester |
New Ouse Viaduct (Guided Bus replaces railway) with very narrow path under construction. Path is to be dedicated as public bridleway, but is too narrow and frighteningly close to fast-moving buses.
Comments reflect the views of the original submitter only.