Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Event or temporary issue |
Tags: | None |
Date time: | 8.43am, Tuesday 18th May, 2010 |
Time line: | Earlier | Later |
Facing: | Unknown |
Added by: | martin |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
James being interviewed about the Gilbert Road scheme
Comments reflect the views of the original submitter only.