Add to Gallery: | Add this photo to a Gallery |
Category: | A narrow place, difficult for cycles to pass.: A problem that needs to be fixed |
Tags: | None |
Date time: | 8.38am, Wednesday 1st June, 2011 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | jonwarbrick |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Contractors using "cyclists dismount" even though the main carriageway is entirely passable. (C.f. #31143 for a subsequent view)
Comments reflect the views of the original submitter only.