Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cycle, deconstruction, lane |
Date time: | 11.31am, Tuesday 20th September, 2011 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | mitcml |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Colchester |
Months after the new Crouch St cycle lane was installed it is being ripped up for alterations after a petition from local traders.
Comments reflect the views of the original submitter only.