Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | double-yellow |
Date time: | 4.46pm, Thursday 5th March, 2015 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Cambridge |
Link from Hills Road to the Busway. No idea why there are Give Way lines, as the road to the left is blocked with bollards.
Comments reflect the views of the original submitter only.