Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | art, junction, new, park, path, sculpture, surface |
Date time: | 2.16pm, Saturday 25th April, 2015 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Edinburgh |
The newly surfaced path through the Burdiehouse Burn Valley Park, at the turn-off for Gilmerton Dykes Street.
Comments reflect the views of the original submitter only.