Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cardonaldquietway, construction, installation, lighting, park, path |
Date time: | 4.14pm, Sunday 1st November, 2015 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
A path undergoing reconstruction, with installation of lighting, in Cardonald Park.
Comments reflect the views of the original submitter only.