Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: Other (infrastructure-related) |
Tags: | cambridge |
Date time: | 4.11pm, Wednesday 11th November, 2015 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Cambridge |
Much needed resurfacing of this cycleway (ten days during one week??)
Comments reflect the views of the original submitter only.